Pages

Showing posts with label Patio Palapa. Show all posts
Showing posts with label Patio Palapa. Show all posts

28 October, 2018

Progress on Patio Palapa

After several days of forced inactivity because of rain or things being wet because of rain, and just generally waiting for them to dry out, the past two days have seen a lot of activity.

Short Recap - the Old Thatch
In short, our old patio palapa thatch had deteriorated past the point of no return. We liked the way the parking palapa now looked with its new zinc roof and felt that was the way to go with the patio palapa.

We also thought it would be a short (ha, ha) project. A couple of weeks and we would be benefiting from having a quiet little retreat to read, meditate, zone out, or whatever.

So, of course, it has become one of those projects that seems - no, does drag on interminably.






Framing Added
Getting Angles
Mahogany Varnish Going On














Once the framing had been completed Mario's boys, started varnishing all the remaining wood of the palapa, a striking mahogany red varnish. This activity went quickly and was able to be finished before the rains started up again.

At first, we thought that it might be a bit too red, but not only does it grow on you, but the color darkens a bit and seems like the right shade

Varnishing All the Lumber
Add caption
Making the Screen Frames














Just like with the pool enclosure, the frames by themselves, look massive. Of course, those get the same varnish treatment as the framing pieces.

Screen Room Doorway
Looking Up to the Center
A lot of Wood to Varnish



Screen Panel Trial Fitting

Like Stretching a Canvas









Applying Varnish












Getting Ready for Screen
Another Can of Varnish
Looking Substantial

Pouring More Varnish

Anchoring the Doorway

Screens Up!

It seemed as though the varnish and the screens were installed simultaneously. They actually wern't, but it was a close thing.

Then suddenly, the zinc was here and they began cutting angles so the pieces would fit on the roof. No other way around it, there was a fair amount of waste, but surprisingly, a lot of scrap pieces were able to be used.

Zinc Has Arrived
And the First Piece
Being Fitted

Make Sure It Fits

Leftover Pieces


Showing Gaposis

Daisy Checking Everything

Checking the Work

Stuffing Foam Gap-Tape


































Then we had a momentary distraction. On the front of our house was this huge tarantua. She was about 5-inches, wing-tip to wing-tip. And, she had a bright red behind that didn't really show up all that well in the left photo, but is really bright in the right. After taking a couple of pictures, we left her up to her own devices. As long as she stayed outside, we'd get along fine. They're actually pretty docile creatures.

Momentary Distraction
Nice Red Behind














Filling In the Holes
Endher Filling Ridge Cap
Better Doorway Shot















Fabricating the Palapa Cap

Fastening the Cap


Magnetic Screen Door
Now, we're just waiting for the wood screen door. We got a magnetic screen door from Amazon.com, but we need to have the wood screen door installed to be able to fasten the magnetic door to the wood frame of the wood screen door.


05 October, 2018

Let's See Now, Where Were We?

Last time I posted about the patio palapa, the project had barely gotten started and that post was on 24 September 2018.

I suppose it would be better to give a brief synopsis of the project from the beginning.

Getting thatch from the bush, where you have to get it, has become expensive. The plants are still further into the bush and are becoming scarce, so it was time to rethink roofing materials.

We were very happy with the way the parking palapa turned out, so we thought, continue with a good idea for this.
What It Looked Like To Start
It was really looking raggedy and neglected. We waiting about as long as we could. Any more, and the lumber used for the structure would begin to rot before our eyes, and we'd be looking at completely starting over. So this was the perfect time.

Mario's crew, the same guys who redid our pool and its enclosure, were just finishing up a house for Sonja and Dan, friends of ours, building over in Ranchito near the airstrip.

We like their work, and attention to detail, so hiring them was really an easy decision.



Lots of Air Vents
I think in places, there was more air and daylight than thatch. It gave us a good indicator that it was time, time, time to get something done.

They got started removing the thatch and broken wood. That took pretty much all of the first day.

Once all the thatch was gone and the patio swept, it almost looked presentable again.






Framing Started
With things cleaned up, it looks nice.

You can see that the framing for the soffit area (I guess) and the framing for the screens which will go floor to ceiling is underway.

We have a ceiling fan that only works slowly. I suspect its capacitor is failing. It was in the utility room off the kitchen and has spent the past few months in a box.

Dianna suggested we replace the lantern chandelier with the fan and light because there are times when we used to use the palapa, where there was no breeze. It becomes stifling, and a fan might just do the trick to make it a nice, relaxing reading and relaxing nook.


Tool Repair

As with most tools down here, things break. One of their cordless drills, with a keyless chuck, naturally broke. Not good timing. Almost everything with this project involves screws, so it was really needed.

Forty-five minutes work, and it was back functioning again. I don't know if they were able to repair the chuck or if it required a replacement from Lano's Hardware.






Adding More Varnish
The next step after getting all the lumber in place was to apply a liberal dose of varnish.

Of course, when they started that, they were only able to do a partial coat when it started to rain. The rain continued off and on for three days.

Even after it stopped, it still took most of a day to dry the lumber out enough to be able to apply more varnish.






Screen Framing Done Too

Getting some real progress now. It's looking almost like it's time for the zinc roof to be installed.

But wait, there's more. I'm sure the framing for the screens will need a coat or two of the varnish.








I Think There's More To Do
Refilling a painting cup must mean that more varnish has to be applied.

That's what they're doing this afternoon. It was really doubtful that they'd be able to work this afternoon.

The forecast was calling for more rain and thunderstorms all afternoon.

24 September, 2018

Patio Palapa - Labor Commences

Carlos and I were out in the parking area assembling the last of 12 'tomato' cages (we'll use 'em for lots of other things) when I noticed Endher's truck parked just outside the utility gate.

Finishing De-Thatching
 I was surprised at just how fast the last of the thatch was pulled down, and how soon the guys got the patio all cleaned up.

At my suggestion, the debris was tossed over the fence into Mike and Steph's yard. Mario's crew is under strict orders to clean up all the debris and remove it.

Carlos is keeping a close eye on things as maintaining their yard is his responsibility. They'll also be bringing in whatever lumber they need for the project the same way. Otherwise, it's a long walk around our house to dump debris into the truck or to bring in the lumber.



Endher and Mario Planning
 Endher and Mario discussing how to do the framing. I want the look and feel underneath to be similar to the parking palapa, so those skinny sticks, for the most part, will be staying.

There's also going to be screening, just like in the pool enclosure, but we'll get to that when that part arrives.








Croc in the Canal
There's no shortage of supervisors either. Here you can see one of our local residents (inside the red circle) taking an interest in the goings-on.

This is a juvenile croc, probably around five to six feet in length. He cruises past our place at least once a week. It's either this one or another juvenile that spends a lot of his/her time under the fishing pier across the canal from us.

Whenever I backwash the pool, which empties into the canal, the croc scoots across the canal and keeps his nose right next to the marl cloud released as part of the backwash process. Sniffing a potential meal no doubt.

Cutting Compound Angles
This afternoon, the guys have been spending their time getting angles cut in preparation for setting a facia board (may not be the correct term, but it'll do). It's basically going to be a six-sided structure surrounding the old palapa.





Hanging Palapa Lamp
 Here's the old metal lantern lamp that hangs from the center peak of the palapa. It will be reinstalled as soon as possible to keep it from getting damaged.






Little Better View of the Angles
This photo gives you a little better idea of the angles involved. Of course, nothing is even all the way around, so it becomes tricky.

Also, all day today, we've dealt with thunder, lightning, and periods of rain. Since a woman in Ranchito having been recently killed in her backyard by lightning, safety is more on everyone's mind than normal.

23 September, 2018

Patio Palapa Makeover

Like I said on the last post, on a tentative note, Mario's crew is supposed to be starting Monday morning on the patio palapa. But after one of the biggest holidays of the year, Independence Weekend (Independence Day was 21 September), it remains to be seen just how up for the task they'll be, come tomorrow morning.
Patio Palapa














What they 're going to be working on is the roof of the palapa. We're having them replace the thatch with zinc, just like was done for the parking palapa. And, it's going to be screened in, just like the pool enclosure. We'll have a screen door as well, but also, when we're using it, we can leave the screen door open, because we'll have one of those magnetic screen curtains across the doorway area.

Yes, It's Seen Better Days
Although it looks like it got whacked by a hurricane, nothing like that has happened. The thatch just needs some serious repair. But, since thatch is becoming harder to get, as well as more expensive, we delayed repairs as long as possible.










No Hurricane - Yet
What we're going to now is similar to what we did with the parking palapa - it will get a new zinc roof, which should last much, much longer.

The current roof just lets too much light and rain in.

Oh, I almost forgot. It will also be screened in so a favorite place to sit quietly and read a book will be resurrected once again. It should be similar to the screening we currently have around the pool enclosure.