That translates from the Latin roughly,
Guesthouse Projects Proceeding.
 |
| Guesthouse Kitchen Faucet |
The latest project I've been working on is installing the kitchen faucet for the guesthouse. It's a beaut. We had gone to Chetumal to look at several places for kitchen faucets. We didn't really see anything we liked and they weren't very cheap. So, I went back to Lano's Supply and looked at their faucets and we bought one.
Drilled a hole in the resin and fiberglass sink, got the faucet installed. This took a while as I though we had a leak in the faucet after I first hooked it up. Turns out a gasket was missing in the hand sprayer, which Lano's replaced, free of charge.
Next up is the one I'm currently working on.
 |
Under Sink Kitchen Drain
|
This bit has gone from bad to worse. It started as a small drip at the p-trap, and has now grown to a steady stream. Very frustrating. I'm currently rebuilding the white drain pipe assembly and will rework the glued connection to the stand-pipe. I think I've got some angles wrong. But we'll get it sorted out soon. It's just frustrating in that this side is the non-pressurized side, and the leak has gotten worse the more I've tinkered with it.
---------------------------
On the other hand, a miss is as good as a mile, especially if it's visible for a mile or more. In this case, it's the new construction and signage on the forth floor of the new Cinty's building.
 |
| Phillip Batty dna Sons |
We noticed this one the other day, of course, while walking the doggies.