Pages

Showing posts with label Corozal Bay Inn. Show all posts
Showing posts with label Corozal Bay Inn. Show all posts

24 April, 2009

The Water is Falling, The Water is Falling...

I just love it when a project comes together. This one came together almost flawlessly.

In the previous posting (http://winjama.blogspot.com/), you could see the notch Cody and I were cutting into the pool-side wall of the pump house. This was to house the new waterfall unit I had ordered from the States.

The unit itself was two-feet across, with a six-inch lip and a three-inch plenum box, both running across the whole width. the six-inch lip is where the water comes out as a nice sheet, making a really cool waterfall.
Cody, Using the Air Chisel
We started off making a 1-1/2" by 25" notch at the very top of the wall. We assumed that 4" blocks had been used all around the walls of the pump house. Wrong. On the pool side, 6" blocks were used, but we didn't find that out till we had finished the notch and stuck the waterfall unit in to trial fit it.

There was a short-fall of about two inches. Of course, this meant that we were going to have to cut a larger notch in the back to accommodate the box portion of the waterfall. And was probably a good thing, as that notch, forming a shelf, would help support the waterfall unit itself.

After finishing the notch - front and back, we trial-fit the unit again and got Dianna's concurrence that it was centered and level. I had purchased a small bucket of hydraulic cement (sets in 2-3 minutes and is designed to cure under water. I didn't want to buy a whole back of cement. Most of it would have gone to waste.

As you can see below, we slathered it in the back, as we had done the front of the unit. Neatness didn't really count. With a 2-3 minute set time, your working time is even less - about a minute to a minute and a half at best. We didn't fully encase the backside just in case we ever have to remove the waterfall unit, it will be relatively easy to chip the concrete away, cut a pipe and slide the unit out.

The Waterfall From the Backside
Closeup of The Waterfall
The hangy-down thingy is a rock and debris trap, so that any incoming crud will get trapped before going into and blocking part of the waterfall outlet. The outlet is extremely critical to obtaining a smooth sheeting waterfall. The slightest piece of material will disrupt the smooth flow and will be immediately noticeable.

As you can see below, it looks pretty cool.
The Waterfall in Action
Here's a closeup of the waterfall. The only part of the whole thing that remains is an approximately 1/2"x24" reveal. It barely sticks out 1/8" from the wall.
Waterfall Closeup
I was apprehensive when it came time to turn on the pump. I don't think Cody really knew what to expect. It wouldn't be the first project that blew up at the start... Not that I do bad work, it's just that sometimes, sh** happens. Anyway, when the pump was turned on, there was no need to doubt our handy work. It functioned exactly as advertised with nary a leak.
Couple of  Happy Campers
Just so you know, I'm not shirking my other duties. On the walk this morning, Cindy carried the mail (one letter) and 4 lbs of bones from the market. Secret also carried 4 lbs of bones and in addition, carried some onions, okra, romaine lettuce, cilantro, and green sweet peppers.

Just in case you were wondering about costs of things, bones for the doggies, knuckle bones chopped into quarters and bagged in four separate bags (so each dog has a load to carry and that their packs are balanced) cost $1.00 BZ per pound, or $8 BZ total. The veggies came to $8.00 BZ total for 2-onions, 2-peppers, 5-okra things, a bunch of cilantro, and a head of romaine lettuce. Secret carried all the veggies.

Along the way back from town, I stopped and shot the Corozal Resort sign again. This time it had landscaping done, making it look quite professional. They're also adding an almost 25' planter box behind the sign.
Corozal Bay Sign Landscaping
What happens next at our place? Well, so there's little danger of paint being spilled on the mosaic, painting of the pump house will take place next. After that, I'll install the mosaic. Barring the unforeseen, it should go quite quickly. I'm looking forward to seeing that whole project jus

12 April, 2009

Happy Easter

I hope everyone was visited by the Easter Bunny. Hard boiled eggs for sure, just leave out all the candy.

Yesterday, I showed you a picture of Kent painting the new sign for the Corozal Bay Inn, which, according to the new sign, is now the Corozal Bay Resort. Same difference, I guess.
Looks Pretty Good
I'm not sure if the sign is finished or not. Kent wasn't there this morning, so we'll have to wait till after the holidays to find out.

Today is the day the dogs and cats here get their heartworm and flea and tick medications. Mmmm, yummers. From what Dr. Sheila says, even dogs and cats in the States should get heartworm meds as well. I know we never did. We do now, religiously. She says new research shows better than 20% of all dogs and cats have heartworm.

18 June, 2007

Good Times, Bad Times...

It started off innocently enough. I had posted a piece about dining at "Munchie's".

"good times, bad times,
You know I had my share"
Led Zeppelin, Album: Led Zeppelin I

Jenni emailed me wanting to know where Munchie's was... Oops, I corrected that post quickly to "Butchie's". After a chuckle all around via email, Jenni invited us to meet with them for lunch at Corozal Bay Inn. We readily accepted.

We had always talked about going there, but just never quite got around to it. You know how things go.

So, anyway, yesterday, we all met at the Corozal Bay Inn <> at about 12:30 PM for lunch. Everyone at our house had had a light breakfast, and we were definitely ready to put the feedbag on.
Clockwise from the left: Elsie, Dianna, Dave, Nigel, Annie, and Jenni
So, here we were, around the table, under the palapa roof of the bar, pool and beach nearby, nice breeze from the trades off of Corozal Bay, cold drinks in hand, great conversation, our orders placed for food - what could be more perfect?

I suppose that one, if they were really picky, might suggest actually getting the food. I don't think that would seem unreasonable.

On with the story. We had gotten through two rounds of politely nursed drinks and at about hour 1, the bartender arrived with a plate of conch ceviche that no one at our table had ordered. After getting that straightened out, as he departed, he said our orders would be up in five minutes.

As hour two came and went, along with the anticipation of our food arriving, it really began to dawn on us... Two hours. TWO HOURS??? and not a nibble at the table?

the Corozal Bay Inn's Website says:

"The "hot" spot is the "coolest" place in town... The "Rainforest Restaurant & Poolside Bar" has meal service available from 8:am until 11:pm... Patrons can enjoy dining while overlooking the Corozal Bay, the swimming pool and gardens. Hand-carved tables and chairs bloom with colorful flowers. All day long, the menu offers a wide selection of tempting entrees, with a list of wines and champagnes to compliment the meal..."


That is, if you every actually get any food. We don't know, because we never got any. We also didn't get an apology from anyone. From the bartender; the manager or owner, whatever he was; or anyone!

How the Corozal Bay Inn was awarded a "star" from Fodor's Belize 2007 is beyond me. Unless... But, we won't even go there.

Needless to say, we went next door to Tony's Resort and Inn, where we did get service - speedily and with a genuine smile. And, it was as tasty and enjoyable as we had imagined our lunch was going to be.

If you want a great time in Corozal, do yourself a favor and avoid the Corozal Bay Inn.

One can only hope they find the way to fix their poor attitudes and extremely poor service. The setting is great and the atmosphere could be great, if there was any service to go with it.