10 November, 2015

Pool House Expansion Project, Day Thirty-Four, 09/11/15

The Excavator arrives and gets to work.

Day Thirty-Four, 09 November, 2015

Excavator, Track Hoe, Big-Ass Piece of Equipment, whatever you want to call it. Should be here Monday, around 10:00 AM or so. And so it was. It arrived about 10:30, give or take a few minutes.

It was mounted side-saddle on the low-boy trailer so they just had to drive it off the trailer and through the gates with plenty of room to spare.
Trummer's Machine Arriving
 Here it comes through our trees. Kind of cool how low it can tuck itself to get through. Not bad for basically a huge machine.
Ducking Down Below the Trees
 Arriving at the actual place where the work needs to be done. It's first order of business is to move as much of a pile of sand that was in its way as possible.
At Last - Into the Work Area
 First off, un-tucking itself, it stretched, and then got righ to work.
Stretching It's Arm - Ready To Go
 A couple of scoops of sand and this pile was no longer a problem.
Gotta Move the Sand Pile
 I thought you might like to see the nuts and bolts that actually anchor the trusses to the chain.
Some of the Nuts, Bols, and Washers to Hold the Trusses On
 Now's the fun part. The machine picks up the first truss and begins to swing it around and move it up to the north end of the roof.
Hoisting the Fierst One - the North Gable End
 Up and over. Gently does it. The guys are keeping it under control with lines on either end as the Track Hoe moves it along to its final position.
Up and Over As It Goes
 Omar's directing its placement on the end. It will still need some final tweaking and adjusting.
Omar Wants It Right Here
 Everybody gets into the act. This first one was the hardest. The boom hadn't gotten to the site yet, so there was barely enough room for the Excavator to maneuver the truss. It was tough for the guys to move it too. Each of the gable end trusses weigh about 1,500 pounds, or so. All of the truss lumber is bullet-tree wood, an extremely dense and heavy wood, that can effectively only be cut and drilled while it's still green. All the truss lumber for this project weighed in the vicinity of six and three-quarter tons. Magnificent, heavy stuff. Virtually termite-proof because of the density.
A Little This Way
Here's a shot showing the blocks that had to be trimmed so that the end gable on the north end would seat just so. This had to be done, as this is where the two structures, the existing pool house and the new construction actually come together. Wasn't necesary for it to be done on the other end.
The Angle Fits Perfectly
Now, with the boom in place, moving the trusses is significantly easier, and since most of them aren't gable end pieces, they're quite a bit lighter and more easily maneuvered into place.
Picking Up the Third One
From the inside, you can see progress is coming fast. Once the boom got here, the process moved right along. The machine was only here a little over three hours, much faster than we had initially estimated.
Adjusting Another One
Just a shot to show you the cubby above the closet that will also be where the access hatch to the attic will be located.
Future Site of Attic Access Hatch
In addition to bolting each truss to the anchor points, they are joined by wood pieces temporarily until the furring strips can be added prepatory to the roofing zinc being added.
Joining Them Together With Wood Pieces
The last truss is in position and being fastened into place. Not as hard as we thought it might be.
The Last Truss Going Up
Carl had to use a couple of wood pieces to push the center of the last truss into place until weight could be applied to the truss.
Bracing With A Couple of Boards
Once that was done, we had one last chore for the machine - dig the septic tank hole. Since we're going to use a Rotoplas plastic septic tank, a deep hole, relatively small diameter had to be dug within the confines of the steel markers.
Marks Where the Septic Tank Will Go
The first push into the ground. That lets you know just how powerful this machine is. That marl is as hard as concrete, but seemed like butter to the machine.
Starting to Dig the Septic Tank Hole
The machine's operator, is really an artist with that thing. Notice how close he's come to the markers.
Fine Precision Work
After about ten minutes work it was all done.
Finished Septic Tank Hole
About that time, after the danger of falling debris, etc., had passed, Dianna thought she would come down and inspect how things have gone.
Dianna Inspecting the Work
 Altogether, a short day's work for the crew. Hot but short. There's a ton more photos of this phase of the project. See the next paragraph to access them.

There's many more photos than appear in each posting. You can see all the photos of the construction project on Flickr at: https://www.flickr.com/gp/winjama/0wVc3s. There will be new photos added each day of the project.

07 November, 2015

Pool House Expansion Project, Day Thirty-Three, 07/11/15

Getting Ready for the Excavator

Day Thirty-Three, 07 November, 2015

Excavator, Track Hoe, Big-Ass Piece of Equipment, whatever you want to call it. Should be here Monday, around 10:00 AM or so.
Case Track Hoe or Excavator (courtesy of CASE, Inc.)
 I was worried about the width of the tracks on the beast. The guys had just repaired (again) the gate, to get it to swing open smoothly. I could just see that Monday, they'd have to dismantle it to get the track hoe in to do the task with the trusses.

Apparently, not to worry. The gate opening is close to fourteen feet, so there should be plenty of clearance for it to enter and depart. Not too sure about trees though. At least one of the trees would be a small loss if the track hoe had to take it out. Well, we'll see what happens on Monday morning.

The crew arrived fashionably late this morning. It was all Carl's fault. Crossing the border was crowded this morning. Anyway, it's a good day to get this stuff done. It's all stuff that needs to be done before Trummer and his Back Hoe show up on Monday.

Here Omar is laying out the lines to determine the angle. They need that because, as you'll see, the blocks on one end need to be trimmed.
Omar Laying Out the Angles

Carl and Omar getting the crew started on the day's project.
Starting the Day's Work
Enjoying the view while making sure everyone understands just what trimming needs to be done.
Going Over the Game Plan
The trim angle has been layed out and now chipping away to achieve that angled has started.
Even Fresh Concrete is Tough
Here, they're measuring to determine the center point and layout the trim angle on this side.
Finding the Center Point
 Below is what the west side cut looks like. East side will be similar.
West Side Truss Cut
Here's the completed line for the truss to lay down on. It's the outer ends on both that need trimming.
New Line for Last Truss
Getting the angle trimmed down so the truss will fit exactly.
Trimming Blocks Down to the Angle
 And, after surgery, here's what the finished item looks like. It'll be interesting to see how it all fits together.
East Side Cut Completed
This is the tile design and color that Dianna likes for the shower.
Dianna's Favorite Blue Tile for the Shower
In real light, this is more a blue-green, instead of a blue.
Not So Favorite Blue Tile
And this is not white no matter what they say.
Not So Favorite Off-White Tile
Carl and I went over to Robert's development and took a look at the installation of the Rotoplas septic tank and drain field.
Rotoplas Septic Tank Cover
Here's the soak-away. More like a buried barrel.
Soak-Away Near Septic Tank
I was a busy boy too. I got in the pool, and decided it was time to take half the awning down, which I did.
Half the Pool Awning Down
There's many more photos than appear in each posting. You can see all the photos of the construction project on Flickr at: https://www.flickr.com/gp/winjama/0wVc3s. There will be new photos added each day of the project.

06 November, 2015

Pool House Expansion Project, Day Thirty-Two, 06/11/15

Removing the Forms Day

Day Thirty-Two, 06 November, 2015

Thursday was an off-day which worked well for all concerned. Recovering from the election, and giving the form concrete another day to rest and strengthen.

Today, began the process of taking the lumber down. All the forms came down today. A lot of wood too. I forgot to shoot a picture of the stack of lumber we have now.
A Lot Easier Than Putting It Up
One of the problems the guys had to deal with is figuring out how they're joining the old pool house to the new bit. This is the way it will be done. Build up a new line for the end truss to sit on, which is what they're doing in the photo just below.
A New Roof Line For the Last Truss
The truss itself will be slightly different than all the others. It will have a louvered window just like the other end truss. But, it will have a horizontal member raised up enough so that it will rest on that new line. In other words the horizontal member will be short enough to sit on the new line, yet stay symmetrical with all the other trusses.
Adding A New Line of Blocks
Here you can see some of the roof truss anchors sans form wood.
Looking At Anchors
An overall shot of the top of the chain or belt beam.
Looking Over the Roof
The chain makes it all look just that much more substantial.
Looks Taller Already
Here's the new line of block from down below.
New Line of Block From Inside
Late this afternoon, John Trummer came by to see what the job entailed. He's planning to bring the Track Hoe, or Excavator to the project Monday to hoist the trusses into place. That should be fun to watch. I'm planning to document it as well. John is also going to dig a hole for the Septic Tank. We've decided to go with a Rotoplas septic tank instead of the concrete ones we're familiar with. I'm curious just how it will work.

Tomorrow will be an easy day for the crew. They'll get the place ready for the Track Hoe and that will be about it. Then they'll be off till Monday morning. Me too. Well, except for laundry and other chores and the obligatory run into town.

There's many more photos than appear in each posting. You can see all the photos of the construction project on Flickr at: https://www.flickr.com/gp/winjama/0wVc3s. There will be new photos added each day of the project.