Yesterday, the day after Nelson's foaming episode, I stopped in to see Dr. Sheila about an unrelated matter.
Of course, I asked her about young Nelson and if we had done the right thing. We had. Sheila said the toxins for both cane toads and other poisonous frogs here in Belize easily enters the body through the mucous membranes (the mouth). That's partly why it's so important to rinse out the victim's mouth - to dilute and get rid of the toxins in the mouth. The other thing that water does is helps cool the body, as both cats and dogs have inefficient cooling mechanisms (they pant instead of sweat). In fact, this advice pertains equally to dogs and cats. The toxins cause the victim's heart rate to elevate, among other things, and help raise the body temperature.
This can become critical if the victim encounters the frog or toad, and because of resultant convulsions, etc., they become overly exposed to the sun and heat before you become involved in the situation.
One of the items I read online said to use a hose to rinse out the victim's mouth. That should be OK for a larger animal, but for a cat, it might be overkill. What Sheila recommends is having a bottle about the size of a used dish soap bottle on hand (well cleaned out) and filled with water that you can then rinse out the mouth with a little more gentle flow of water.
In most cases, this is about all the treatment you can do. Again, make sure to keep the victim cool.
Also, Sheila said if they continue to convulse or jump around the way Nelson did initially, you can bring the victim in to her clinic and she can sedate them to try and get them calmed down.
Pretty much, at this stage, they're either going to survive or not. There's not really anything else that can be done. She also said, cats seem to learn after the first episode, that it's a good idea to leave frogs and toads alone - at least not to try and eat them. Some dogs, on the other hand, learn a much harder lesson and repeat time after time.
So, we did the right thing and Nelson helped by calming down and sleeping it off. What a relief.
I guess by way of disclaimer, that this information, I gratuitously termed 'advice' above, should be considered little more than well-intentioned gossip. If you follow it , you do so at your or your dog or cat's peril. Check with your family Vet. Your situation may be completely different. If nothing else, you've got a rough guide to follow till you can reach competent veterinary medical care.
Showing posts with label Medical Treatment. Show all posts
Showing posts with label Medical Treatment. Show all posts
15 May, 2013
15 April, 2008
Moving Right Along
at
20:47
I am going to try to document as well as I can the construction of our parking palapa. It's basically a traditional construction method, using native materials, but in this case, quite well engineered and fastened completely with threaded rod, nuts and washers, and lag screws.
We were extremely fortunate to get the services of Mr. Florencio Rodriguez, arguably the premier builder of palapa structures in this part of Belize, if not the whole country. He built (and repaired after Hurricane Dean) the extremely impressive roof structure of Jim and Melanie's Trinity House on Gringo Lane.
The best comparison is right at their house - Florencio built their palapa roof, which withstood Dean with minimal damage of a few lost pieces of thatch, whereas, the palapa roof of Greg and Connie, right next door, wasn't built by Florencio. It collapsed and after Dean was converted into a burn pile. I guess that about sums up his expertise and provides the best recommendation of his skill and art.
And he really does look at it as art. He tries to do something a little different and unique in each palapa he builds. From the selection of interesting wood shapes and types, to differing geometries of the structure, etc., he tries to create interest in each structure.
This is how palapa's should be built.
It starts off yesterday morning, shortly after 6:00 AM when Florencio and his crew arrive. They get to it right away. We had marked out the location for the columns the previous day, so they were able to start digging right away.
As soon as the holes are dug, "Thunk"! In go the very heavy colums.
This next photo shows the crew hoisting the column to slide it into the hole. It really reminds me of the flag raising on Mount Suribachi, on Iwo Jima during WWII. One of those things you don't notice at the time. It only leaps out at you as you're editing the photos afterwords.
Of course, after the columns are raised, they tamp in sand to stabilize them. Florencio doesn't like to use concrete to encase the columns, because it doesn't let water run away from the wood. It traps it and only causes the wood to rot. It's such a dense, heavy wood that as long as water can get away through the sand, a column should last 35-40 years. I really don't think I'll care much if it rots out after that time.
Once the columns are all upright, they're trued up and trimmed to the proper height. Then each is notched to receive the longitudinal beam.
If a longitudinal beam isn't long enough (as was the case with one of our two) then Florencio notches the two pieces and they're joined by a series of threaded rods, washers and nuts before they're raised into position.
Once the beam is up in position, then it's tied off and drilled so that threaded rod can be fed through it and each column. Then as cross beams are added to the mix, they're trimmed after being bolted into place.
It's beginning to look like a structure. Cross beams all get placed, then the rafters are placed. These are also bolted - at each apex and to the beams, then they're joined by a ridge pole which is also bolted into place.
During the day, Florencio, took a couple of hits on his big toe, which he had previously injured. He was in quite a bit of pain. Dianna took over and doctored him with some antibiotic ointment and Ibuprofen. Later, he went to the hospital and got some pills to help with infection and swelling.
Just so we keep everything in perspective, some folks just don't get too excited about all the hub-bub going on around them.
Cody, even though he's recovering from a pretty severe cold, managed to put in a heavy day's work as well. he finished up one soak away for the roof gutters to come and started another. He also filled in the trenches for the water/electrical line additions out to the palapa.
The third project going on at the same time (three-ring circus anyone?) is the finishing of the "basement". Installing the metal studs to separate Dianna's and My workshops, and to provide definition for the store room.
We were extremely fortunate to get the services of Mr. Florencio Rodriguez, arguably the premier builder of palapa structures in this part of Belize, if not the whole country. He built (and repaired after Hurricane Dean) the extremely impressive roof structure of Jim and Melanie's Trinity House on Gringo Lane.
The best comparison is right at their house - Florencio built their palapa roof, which withstood Dean with minimal damage of a few lost pieces of thatch, whereas, the palapa roof of Greg and Connie, right next door, wasn't built by Florencio. It collapsed and after Dean was converted into a burn pile. I guess that about sums up his expertise and provides the best recommendation of his skill and art.
And he really does look at it as art. He tries to do something a little different and unique in each palapa he builds. From the selection of interesting wood shapes and types, to differing geometries of the structure, etc., he tries to create interest in each structure.
This is how palapa's should be built.
It starts off yesterday morning, shortly after 6:00 AM when Florencio and his crew arrive. They get to it right away. We had marked out the location for the columns the previous day, so they were able to start digging right away.
As soon as the holes are dug, "Thunk"! In go the very heavy colums.
| Digging the Holes |
| Preparing for the lift of the Column |
Of course, after the columns are raised, they tamp in sand to stabilize them. Florencio doesn't like to use concrete to encase the columns, because it doesn't let water run away from the wood. It traps it and only causes the wood to rot. It's such a dense, heavy wood that as long as water can get away through the sand, a column should last 35-40 years. I really don't think I'll care much if it rots out after that time.
Once the columns are all upright, they're trued up and trimmed to the proper height. Then each is notched to receive the longitudinal beam.
If a longitudinal beam isn't long enough (as was the case with one of our two) then Florencio notches the two pieces and they're joined by a series of threaded rods, washers and nuts before they're raised into position.
Once the beam is up in position, then it's tied off and drilled so that threaded rod can be fed through it and each column. Then as cross beams are added to the mix, they're trimmed after being bolted into place.
It's beginning to look like a structure. Cross beams all get placed, then the rafters are placed. These are also bolted - at each apex and to the beams, then they're joined by a ridge pole which is also bolted into place.
During the day, Florencio, took a couple of hits on his big toe, which he had previously injured. He was in quite a bit of pain. Dianna took over and doctored him with some antibiotic ointment and Ibuprofen. Later, he went to the hospital and got some pills to help with infection and swelling.
Just so we keep everything in perspective, some folks just don't get too excited about all the hub-bub going on around them.
| Midas Not Overreacting |
| Blue and Dianna Sharing Nap Time |
Even though she likes to supervise everything going on, even Cindy needs some down time. Here she's resting in her favorite perch. The railing was tailor-made to just the right height for her to rest her chin on it and still be able to keep an eye on all that is going on.
The third project going on at the same time (three-ring circus anyone?) is the finishing of the "basement". Installing the metal studs to separate Dianna's and My workshops, and to provide definition for the store room.
| Putting Up the Metal Stud Work |
| More Metal Studs |
During the course of the work, the guys put a skim-coat of mortar on the floor of the store room, just off the utility room. Shortly after that, Cindy trotted right through the middle of it, leaving nice, great big prints right through it. After that, I chained her up outside to prevent a recurrence. Of course, shortly after that, guess who tromped through themselves? I managed to avoid being chained up myself - I'm sure the workers would have like to have chained me up too for that. Mea culpa - I thought it was firmed up enough to tread on safely.
| Footprints in the Sand |
Sometimes, even the project manager has to get down and get dirty. So I did. Here's a couple of shots Dianna took of me connecting the new water line to the existing water main. That pipe in the air is the drain from the washing machine. Wasn't much other way to do it. It's a minimal traffic area anyway.
| Dave Doing Physical Labor |
| Dave Hooking Up Laundry Room Drain Pipe |
Even with all this activity going on, you still have to remember to take time to smell the roses - or whatever is growing nearby. In this case it's a flower in Dianna's garden that decided to bloom a couple of days ago. Right pretty at that.
| Nice Yaller Flower |
Subscribe to:
Posts (Atom)