24 November, 2016

Midweek Workday

This is Wednesday, 23 November, 2016, with more work on the project.

Carlos and Jorge Sharpening Chainsaw
Carlos, our caretaker, pointed out to me a few days ago, that one of our trees near the front of the place, was dead as a doornail and probably posed a hazard.

This morning Carlos, along with his son Jorge, cut it down. Only the upper portion of the tree was rotten. The rest of the tree was very dense, and very hard wood, which caused Carlos to have to sharpen his chainsaw a couple of times.

Glass Blocks In Place
Glass blocks were actually never part of the grand design, but here they are. Well, the explanation is easy. We ended up with a one-foot wide hole between the waterfall area and the column because of design changes involving the waterfall.

What do you do with it? It seemed like too small an area to make a screen frame for. But, then what? Mario suggested maybe trying glass blocks. We jumped on board the idea. So, here it is,

Rene Chipping High Spots
We're almost ready to Diamond Brite the pool. Besides taking care of some old crack patches, there are several bumpy areas that need to be smoothed down so that when the new Diamond Brite coating is put down, that it's really smooth.

Small, heavy hatchets seem ideal for this task. That's what Rene is using in the photo.


The Caps Are Getting Painted
Mario's painter does an excellent job. Fast and methodical, I've never seen a drip or a 'painting outside the lines' error. The painting just looks excellent.






Bani Sanding Wood Filler
The blue screws used to secure the screen frames to the columns, beam, and deck were all counter-sunk. After they were done, each screw was then covered with wood filler and sanded smooth






Theo Cleaning Up Concrete on Blocks
The glass blocks are all installed and cemented into place. Theo is cleaning excess concrete off the face of the blocks. The next step in the process is to apply the terracotta texture to the concrete so that it all matches.





Floor Drain Full Run
Just so you can see the whole run of the deck drain. The drain was made from PVC square-shaped electrical conduit. The conduit cap was then routed by hand using a jig and careful measuring to get the evenly spaced openings.

This is close to forty-feet long. The exit for the drain is at the far end and is tied into the overflow drain for the pool. It's turned out just superb. I couldn't be happier with the result.







Glass Blocks Other Side
Just a view of the other side of the glass blocks. With the blue banding on each block, when viewing them in place, you get a hint of blue in each block.






Ramp Columns Done
The east ramp columns are ready for the railings to be installed. I think it's going to look seriously cool when it's done.







Endher Finishing Wood Frame
Endher is touching up each wood filler covered screw with stain and varnish so they match the rest of the frame.







Detail of Water Line
I asked the painter to paint each of the exposed PVC pipes, which he did. We wanted the deck drain left white as we thought that, although paint would give the PVC more UV resistance, that it just wouldn't hold up well, and would probably show chips and peels soon enough.





22 October, 2016

Saturday Has Arrived

That is, Saturday, 22 October, 2016. Of course it's a work day here at Casa Winjama. I would just as soon take the day off myself, but we also want to get this project done.

Not that we're in a hurry or anything. Just tired of having workers hanging around. It's the same with any construction project. It starts off with hugs and kisses and towards the end it's 'Don't talk to me. Just get done and get out of here.'

Not that we don't like Mario Zetina's crew, we do. They're excellent people and their workmanship is superb. We just want our privacy again.

In the mean time, like I said... It's a work day.

Blocking in the Beams
Mortaring shortened blocks in place down the whole length. As I understand it, there will be like a veneer of blocks across the front to block off the opening of each of the beams. As Endher says, 'To keep the geyco's from moving into the beams. Thanks to the GEICO gecko and those cute TV ads, nearly everyone down here calls them 'geyco's' and not 'gecko's.'



A Little Better View
Here's a little better view showing the beam ends and the blocks going up. It's going quite fast too.







The Reverse Side
And a view from the back side of the blocks. The beams are certainly strong enough for the workers to lay boards over them as a walkway.






Raised Pad for the Filter
Moving from the beams to inside the pump house. This is a newly cast pad for the pool filter to sit on. It's about three-inches high. You can see openings in the wall for the skimmer line, main drain, and backwash.





Window Louver Reinstalled
The window louver got installed late yesterday afternoon. They did a very nice job installing that. This is the louver from the old pump house. In fact, most of the stuff going in here is returning to service from the old pump house.





Skimmer and Main Drain Labeled
A little better view of the openings for the filter. I think this is going to end up being a very clean and well laid out pump house.







Sample For Deck Drain
We've been hoping to find something to use for a deck drain. I'd like it to run along the house, in front of the sliding glass doors, bathroom door and utility room door. It would be nice if it was all one run.

There doesn't seem to be anyone carrying actual deck drain material down here. We thought about shipping it in, but then this alternative showed up.

Detail of Sample
Mario found this. It's 1-1/2" or 2" electrical conduit. It also comes in 3". I opted for the 3". Now, Mario is looking how he can get grooves cut in the top to allow the water to enter the pipe.

If you look close, the lid or top pries off, so that would be perfect as a deck drain. I think the 3" is necessary for the potential amount of rainfall we could likely get.


Old, Crappy Hinges on Door
While the welder was here working on the beams yesterday, he was going to install the pump house door. It's welded in place with rebar sunk into the wall around the door and then the door is welded to the rebar. It becomes quite strong and long-lasting.

What isn't so strong is the crappy hinges that are used by almost everyone around here for metal doors, hatches, etc. He told me there is a good hinge available that can be lubricated and it only costs about $2.50 BZD per hinge.

Compared to the $0.20 BZD per hinge, they do seem expensive. Until you think that I've had the original installer back either two or three times to replace or repair broken or damaged hinges on this door, a gate, and our well-house door. For want of a little grease, we're keeping somebody in business. The welder will be bringing three lubricatable hinges on Monday. If those work as well as he says, I may spring to get the whole batch replaced.

Overall Shot of the Beams
Here's a nice view looking from the patio to the pool showing the beams and the block work. Pretty impressive, I think.







Filling Ends of Beams
The veneer of blocks going up with some stuffed in the ends of the beams to fill the hole, then it will be all plastered over.







Cutting Blocks Down to Size
The rock quarry, where the blocks are being cut down to size with a grinder and a  cutting blade. This brings to mind the song 'Breaking Rocks in the Hot Sun' by the Bobby Fuller Four , released in 1966. It was written by Sonny Curtis of the Crickets - Buddy Holly fame.




The Debris Pile
And here's the debris pile. Hot and dusty.








Hanging on the Laundry Line
I was on my way back from snapping the rock pile and this caught my eye. Hanging upside down, it's my drawing for the ramps. Looks like it might have gotten damp or something.