Getting Ready for the Excavator
Day Thirty-Three, 07 November, 2015
Excavator, Track Hoe, Big-Ass Piece of Equipment, whatever you want to call it. Should be here Monday, around 10:00 AM or so.
 |
| Case Track Hoe or Excavator (courtesy of CASE, Inc.) |
I was worried about the width of the tracks on the beast. The guys had just repaired (again) the gate, to get it to swing open smoothly. I could just see that Monday, they'd have to dismantle it to get the track hoe in to do the task with the trusses.
Apparently, not to worry. The gate opening is close to fourteen feet, so there should be plenty of clearance for it to enter and depart. Not too sure about trees though. At least one of the trees would be a small loss if the track hoe had to take it out. Well, we'll see what happens on Monday morning.
The crew arrived fashionably late this morning. It was all Carl's fault. Crossing the border was crowded this morning. Anyway, it's a good day to get this stuff done. It's all stuff that needs to be done before Trummer and his Back Hoe show up on Monday.
Here Omar is laying out the lines to determine the angle. They need that because, as you'll see, the blocks on one end need to be trimmed.
 |
| Omar Laying Out the Angles |
Carl and Omar getting the crew started on the day's project.
 |
| Starting the Day's Work |
Enjoying the view while making sure everyone understands just what trimming needs to be done.
 |
| Going Over the Game Plan |
The trim angle has been layed out and now chipping away to achieve that angled has started.
 |
| Even Fresh Concrete is Tough |
Here, they're measuring to determine the center point and layout the trim angle on this side.
 |
| Finding the Center Point |
Below is what the west side cut looks like. East side will be similar.
 |
| West Side Truss Cut |
Here's the completed line for the truss to lay down on. It's the outer ends on both that need trimming.
 |
| New Line for Last Truss |
Getting the angle trimmed down so the truss will fit exactly.
 |
| Trimming Blocks Down to the Angle |
And, after surgery, here's what the finished item looks like. It'll be interesting to see how it all fits together.
 |
| East Side Cut Completed |
This is the tile design and color that Dianna likes for the shower.
 |
| Dianna's Favorite Blue Tile for the Shower |
In real light, this is more a blue-green, instead of a blue.
 |
| Not So Favorite Blue Tile |
And this is not white no matter what they say.
 |
| Not So Favorite Off-White Tile |
Carl and I went over to Robert's development and took a look at the installation of the Rotoplas septic tank and drain field.
 |
| Rotoplas Septic Tank Cover |
Here's the soak-away. More like a buried barrel.
 |
| Soak-Away Near Septic Tank |
I was a busy boy too. I got in the pool, and decided it was time to take half the awning down, which I did.
 |
| Half the Pool Awning Down |
There's many more photos than appear in each posting. You can see all
the photos of the construction project on Flickr at:
https://www.flickr.com/gp/winjama/0wVc3s. There will be new photos added
each day of the project.