Pool House Expansion Project, Day 101 - 06/02/16

Vanity Cabinet and Plumbing, Attic Access, Shower Tiling, Temporary Screening,

Day One Hundred One, 05 February, 2016

Sunday, Dianna and I put together a list of items we noticed that still needed to be done or corrected, so a lot of the next few posts will be focused on those sorts of items.

The vanity cabinet with additional bracing, is in place.
Vanity With Additional Bracing For Granite
The attic access hatch has been spruced up, drywalled, textured, painted, an actual cover for a hatch, that sort of thing. It's really hard from the photo below, just what you're looking at. Trust me, it's the attic access, looking up through the upper closet shelf from the floor. That orange thing is a ladder.
Attic Opening Getting Finished
 The piping had holes accurately cut and the cabinet is now positioned properly in it's final location.
Piping Through and Clear
 Omar has been able to get a good start on tiling the shower floor.
Shower Floor Tile Started
He has been very careful to maintain a slope towards the drain. Here, he's double-checking the slope.
Making Sure the Slope Is Right
We've finally got the temporary screen in place. Eventually, a screen door will go there. On the other side, will be a landing slab holding a circular metal staircase going up to the flat deck that we will use as an observation deck. It will also provide easy access to check the roof and gutters, and for me to work on the weather station, which right now isn't working, but I have high hopes to get that back on track.
Installing A Temporary Screen