this is the start of another week. The project is continuing.
 |
Rough Coat Plastering Continues |
The rough coat is, bit by bit, becoming the smooth coat, and that will be topped with the colored concrete texture on the new part of the house. The roof edge will be the blue trim.
 |
Footing Trench for the Ramp |
The accessibility ramp will be large. It's track is going to be 3'6" wide, so that makes it about 7' wide overall. and with about a 12' run (for ADA compliance), so it will be a rather large structure. We're going to have the same railings for it that we had them put up for the Mennonite house. That'll look cool, and will also help unify everything.
 |
Footing Trench Has A Good Start |
The ramp will have a sort of double footing, since it will be folded over on itself. If you're confused, all will be made clear eventually.
 |
Cut Line Shows Width of Ramp |
The cutline in the concrete (where the dust is) is, more or less, the total width of the ramp. The ramp on the other side of the deck, at the parking area, will be a mirror image of this one.
No comments:
Post a Comment
We want to get your thoughts about our posts, and what you would like to see here.
Unfortunately, adding an image to your comment can't be done directly. The only way you can do it is to include the URL of the image from a hosing server, which means that first, you must upload your image to Flickr, Dropbox, or some other image hosting server.
Not very good, but that's all that is available right now.
To post a YouTube video, simply enter the video URL in the comment box. It will appear in the comment box ready to play.
Note: Only a member of this blog may post a comment.