The Pool Project Day Three - 08./12/16

The Lumber Pile Grows
The lumber from the deck, all treated wood, is growing quickly. This pile, on the patio, will soon be joining the larger pile out in the parking area. I can't say that we're going to miss having a wooden deck. We were told that it would be cooler than concrete (it isn't) and since it's treated, you would expect it to last twenty to thirty years (it won't). Much of the wood has already been spoken for, once the constructioneers get done with what they need for the project.

Endher Making Little Rocks
Here, Endher is breaking up a large chunk of concrete that was serving as the footing for the small 4" block wall holding the deck up. I suspect excess concrete was dumped there, hence the rather large concrete boulder.





Douglas Moving Little Rocks
And of course, as the larger rocks get broken into smaller ones, they have to be moved to some other location.

No comments:

Post a Comment

We want to get your thoughts about our posts, and what you would like to see here.

Unfortunately, adding an image to your comment can't be done directly. The only way you can do it is to include the URL of the image from a hosing server, which means that first, you must upload your image to Flickr, Dropbox, or some other image hosting server.
Not very good, but that's all that is available right now.


To post a YouTube video, simply enter the video URL in the comment box. It will appear in the comment box ready to play.

Note: Only a member of this blog may post a comment.